Swift Demo was tasked with a detailed project in Redmond for Cascade Lakes Design, focusing on the careful removal and preservation of baseboards. Each piece was meticulously saved and labeled to ensure a seamless reinstallation after the new flooring is laid. Our team also handled the complete removal of existing carpet in the living room, including the carpet pad, tack strips, and every last staple. To prepare the space for the upcoming flooring installation, we ensured the subfloor was thoroughly prepped, leaving a clean and smooth surface ready for the transformation to come. Every step was carried out with precision, ensuring that the transition to the new flooring would be as smooth and efficient as possible.